Mr Singh’s existing patio was an old, uneven patio slab area with split level. It was run down and uneven in places. He asked us to renovate his decking area, and lay a new block paving patio with center piece designs. We set about lifting all of the old patio slabs and clearing the old earth to make way for the new hardcore base.
After all the old material was removed, we then laid a heavy duty membrane to control weed growth. On top of this we laid some new type one hardcore before starting to lay the blocks. With the hardcore compacted, we set to work laying the blocks. The new patio was then treated to a fine sand layer to further reduce the chance of weeds and moss build up. The entire job took three days to complete from start to finish.
Time to complete: 3 days