Mr & Mrs Brooks had a tired old concrete driveway that had certainly seen better days. They wanted to replace the driveway with a combination of cobblestone paving and tarmac. The project involved the removal of the concrete and to dig out any existing soil and rubble to a suitable depth. Once this had been excavated a suitable permeable membrane was laid. This was to prevent any weeds penetrating the driveway, and preventing any movement of the sub-base into the soil.
The next job was to install the edge blocks, acting as a retainer for the tarmac. The cobblestone section was laid to the right of the property, leading to the garage. the remainder of the drive was completed with SMA Pro Drive Tarmac.
Time to completion: 7 days