?We removed existing concrete driveway that was tired and broken, and disposed of the rubble. We then laid type 1 hardcore foundation as well as weed control membrane.
Ensuring that the drainage system was installed to the front of the driveway and flowing into the drains to the front of the property.
We used beautiful charcoal blocks with a buff edge as agreed with the customer.
Time to completion: 3 days