Granite Cobble Driveway By ED Paving
Removed existing tarmac driveway and installed heavy duty membrane for weed control and type 1 hardcore for foundation. Once the ground had been levelled we then finished the patio paving in granite cobbles designed with edging.
Time to completion: 3 days